System Size: | 673 kW DC |
Location: | 35 Industrial Drive, East Longmeadow, MA |
Timeline: | |
Date Commissioned: | Q3-2019 |
Equipment Used: |
385 Watt Jink Panels |
Toner Plastics was one of the smoothest projects our installers have ever taken on. It was run efficiently by the team and did not require heavy on-site supervision. However, we did face a challenge when it came to the interconnection process. This was one of our longest interconnection shutdowns lasting almost 36 hours. Our team came together to overcome this challenge, bringing in extra crew members and working on the interconnection over the weekend so it did not affect the company.
CLIENT: Toner Plastics
ACE’S ROLE: General Contractor
FINANCE TYPE: Private