We acted as a consultant on-site on behalf of the Department of Environmental Protection for this project. We were hired as the third-party engineer by Citizens Energy to ensure rules were followed and the integrity of the landfill liner was not jeopardized. The major challenge faced on this project was ensuring that the installers followed all the rules and regulations involved in building a solar system on top of a landfill.

Landfill Solar installation at Falmouth, MA

Project Highlights

System Size: 2090 kW DC
Location: 458 Thomas B Landers Road, Falmouth, MA
Timeline:
Date Commissioned:  Q3-2020
Equipment Used:

395 Watt Boviet Panels ((BVM6612M-395-H
Solectria string inverter (Solectria SGI 750 XTM 750KW)

More Photos of the Project

CLIENT: Citizens Energy

CONTACT: N/A

ACE’S ROLE: 3rd Party Engineers
FINANCE TYPE: N/A

Contact ACE Solar for help with your commercial solar installation. Our experts can make the process simple and follow best practices and procedures with every project. 

Let Us Help You Save Money!